For the most part, the cross-section formed is a <em>trapezoid</em>, but if the slice passes through the apex of the pyramid, that shape is a <em>triangle</em>.
(Image source: MathCaptain.com)
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
Answer: If the null hypothesis is true, the probability of observing a sample mean of at least 5.15 minutes is .031
Step-by-step explanation:
Please write (x4 – 2) ÷ (x + 1) as <span>(x^4 – 2) ÷ (x + 1).
We can find the remainder using synth. div. as follows:
_________________
-1 / 1 0 0 0 -2
-1 1 -1 1
------------------------------
1 -1 1 -1 -1
The remainder is -1.</span>
Answer:
there should be a pic or a diagram
Step-by-step explanation: