Answer:
$5,500
Step-by-step explanation:
Since Landen Company uses a single overhead rate of $100 per direct labor hour, the total amount allocated to the deluxe and basic chairs is given by the sum of the DLH used up for both products multiplied by the overhead rate:

The total amount allocated to these products is $5,500.
Answer:
Step-by-step explanation:
As the two figure are the image and pre-image of a dilation.
Considering the left sided triangle is original and right sided triangle ( smaller one) is the image.
As one of the sides of the left triangle (original figure) is 4 in. And the corresponding length of the side on the right triangle (image of the figure) is 2 in.
It means the image of the side (2 in) is obtained when the side (4 in) of the original object is dilated by a scale factor of 1/2. In other words, the side of the image (2 in) is obtained multiplying the side (4 in) of original figure by 1/2. i.e. 4/2 = 2 in
Lets determine the missing side of the right side triangle by the same rule.
As the original object has one of the sides is 5 in and the corresponding side of the image has x in. As the original figure is dilated by a scale factor of 1/2. so the missing side of x will be: x = 5/2 = 2.5
So, the value of x will be 2.5
Similarly, the original object has one of the sides with length (y + 1 in). As the As the original figure is dilated by a scale factor of 1/2. As the corresponding length of the side of the image triangle is 3 in.
so
y + 1 = 2(3) ∵ 3 in (image side) is multiplied by 2
y + 1 = 6
y = 6 - 1
y = 5
So, the value of y = 5
Therefore,
The coordinate of the solution is (2,2)
Answer:
x=−
3
5
=−1.667
Step-by-step explanation:
The answer is 2.5! Hope I helped!