Based in the historical cost principle, the total cost of
the land would be the summation of all cost, either direct or indirect.
Therefore it would be:
Cost of Land = $90,000 cash + $5,000 commission + $7,000
demolishing
Cost of Land = $102,000
<span> </span>
Answer:
c. Loss aversion
Explanation:
Loss aversion is a cognitive bias that explains where there is the pain for losing should be twice as equivalent to the gaining pleasure. It is the tendency of an individual to avoid the losses that purchase the equivalent gains. And, the term that not done the given mistake is the loss aversion
So as per the given situation, the option c is correct
Answer:
The journal entry is as follows:
Work in process A/c Dr. $158,700
Manufacturing overhead A/c Dr. $2,250
To Raw material inventory $160,950
(To record the issuance of materials)
Workings:
- Work in process is debited with direct material:
= 88,700 + 27,600 + 3,650 + 38,750
= $158,700
- Manufacturing overhead debited with indirect material cost = $2,250
Jane must do a system each evening to copy and archive computer data that could be used if a compromise occurs. The process that Jane makes is referred to as back up. Back up process is the process of copying and archiving computer data so that the duplicate files can be used to restore the original data if a compromise occurs.