1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Firdavs [7]
3 years ago
8

What would provide structured content that would indicate what the code is describing ?

Computers and Technology
1 answer:
ZanzabumX [31]3 years ago
3 0

Answer:

A.XML

Explanation:

hope this helps

You might be interested in
Timeliness is an important goal of any access control monitoring system.<br> A. True<br> B. False
Damm [24]
The answer for this question is true
7 0
3 years ago
Fordham3 Hardware is known for its consensus buying center culture. Recognizing this corporate culture, someone attempting to se
balandron [24]

Answer: (c) focus exclusively on the head of the buying center.

Explanation:

As Fordham3 Hardware is known for its consensus buying center culture, so someone attempting to sell to Fordham3 should focus exclusively on the head of the buying center.

8 0
3 years ago
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
Use the arr field and mystery () method below.
kolezko [41]

Answer:

The sum of all positive even values in arr

Explanation:

We have an array named arr holding int values

Inside the method mystery:

Two variables s1 and s2 are initialized as 0

A for loop is created iterating through the arr array. Inside the loop:

num is set to the ith position of the arr (num will hold the each value in arr)

Then, we have an if statement that checks if num is greater than 0 (if it is positive number) and if num mod 2 is equal to 0 (if it is an even number). If these conditions are satisfied, num will be added to the s1 (cumulative sum). If num is less than 0 (if it is a negative number), num will be added to the s2 (cumulative sum).

When the loop is done, the value of s1 and s2 is printed.

As you can see, s1 holds the sum of positive even values in the arr

7 0
3 years ago
HELP BRAINLIEST FOR RIGHT ANSWER
Scilla [17]

Answer:

true I know this cuz I smart

7 0
3 years ago
Read 2 more answers
Other questions:
  • Ajay wants to read a brief overview about early settlers in the United States. Which type of online text source should he most l
    9·2 answers
  • Which piece of personal information do websites often require users to enter?
    6·2 answers
  • What is the name of the symbol that is used to classify and categorize information?​
    10·2 answers
  • What is human data,
    8·1 answer
  • Where do animators work?
    8·1 answer
  • How is an interpreter different from a compiler?
    9·2 answers
  • A major public university graduates approximately 10,000 students per year, and its development office has decided to build a We
    10·1 answer
  • The Internet is based on a U.S. government project called ________. Today, the Internet is a collection of networks, tied togeth
    5·1 answer
  • An object completes one round of circle of radius 7m in 20 sec. Distance travelled after 10 sec is? ​
    12·1 answer
  • Who designed the apple i computer in 1976?
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!