Answer:
27 days
Step-by-step explanation:
A alone, rate per day = 1/36
A and B together, rate per day = 1 / 20
Total Workdone for 5 days :
1/ 20 * 5 = 5 / 20 = 1/4
Fraction of work left :
1 - 1/4 = 3/4
3 / 4 * 36 /1
= (3 * 36) / 4
= 108 / 4
= 27 days
Given:
Uniform distribution of length of classes between 45.0 to 55.0 minutes.
To determine the probability of selecting a class that runs between 51.5 to 51.75 minutes, find the median of the given upper and lower limit first:
45+55/2 = 50
So the highest number of instances is 50-minute class. If the probability of 50 is 0.5, then the probability of length of class between 51.5 to 51.75 minutes is near 0.5, approximately 0.45. <span />