Answer:
Last one
Step-by-step explanation:
A) Divide total miles by total time:
21 miles / 4 hours = 5.25 miles per hour.
B) Divide miles by miles per hour:
42 miles / 5.25 miles per hour = 8 hours.
Answer:
C. 
Step-by-step explanation:
Let x be the total monthly sales.
We have been given that a salesperson earns a salary of $700 per month plus 2% of the sales. The salesperson want to have a monthly income of at least $1800.
This means that 700 plus 2% of total monthly sales should be greater than or equal to 1800. We can represent this information in an equation as:


Let us solve our inequality to find the monthly sales (x).
Subtract 700 from both sides of our inequality.

Divide both sides of inequality by 0.02.



Therefore, the total monthly sales must be greater than or equal to 55,000 and option C is the correct choice.
Answer:
24 hours
Step-by-step explanation:
One member of the gardening club can alone plant flowers in 12 hours.
So in 1 hour he can plant 1/12 of the flowers.
Let the time required by the second member of the club to plant flowers alone be x hours.
Then in 1 hour he can plant 1/x of the flowers.
Now when the two members work together,each hour they can plant:
of the flowers.
But they can together complete the job in 8 hours. So in one hour they plant 1/8 of the flowers.
=> ![\[\frac{1}{12}+\frac{1}{x}=\frac{1}{8}\]](https://tex.z-dn.net/?f=%5C%5B%5Cfrac%7B1%7D%7B12%7D%2B%5Cfrac%7B1%7D%7Bx%7D%3D%5Cfrac%7B1%7D%7B8%7D%5C%5D)
=> ![\[\frac{1}{x}=\frac{1}{24}\] ](https://tex.z-dn.net/?f=%5C%5B%5Cfrac%7B1%7D%7Bx%7D%3D%5Cfrac%7B1%7D%7B24%7D%5C%5D%0A)
=> x=24
So the second member can plant the flowers alone in 24 hours
Answer:
20/7 days (just less than 3 days)
Step-by-step explanation:
Recall that (1 job) = (rate)(time), so time = (1 job) / (rate).
Set up and solve the following equation:
1 job
------------------------------- = time required for 2 pumps working together
1 job 1 job
---------- + -------------
4 days 10 days
This comes out to:
1 job
------------------------------------------- = time required
10 job-days 4 job-days
------------------ + -----------------
40 days 40 days
or:
1 job
-------------------- = (40/14) days, or 20/7 days (just less than 3 days)
14 job·days
-----------------
40 days