The expected completion time is μ = 40 weeks.
The random variable, X = 38 weeks (the probable time)
If the standard deviation is σ, then the z-score is z = (x - μ)/σ.
Let us test the given standard deviations.
When σ=1,
z = (38-40)/1 = -2
From standard tables,
P(x<=38) = P(z<=-2) = 0.0228 =2.3%
When σ=2,
z = (38*40)/2 = -1
P(x<=38) = P(z<=-1) = 0.1587 = 15.9%
When σ=4,
z = (38-40)/4 = -0.5
P(x<=38) = P(z<=-0.5) = 0.3085 = 30.9%
Answers:
z=1 => 2.3%
z=2 => 16% (approx)
z=4 => 31% (approx)
Given the pattern:
4,15,7,12,10,9,..
Every other term after the first term is increasing by 3. Thus continuing the pattern we shall have:
4, 15, 7, 12, 10, 9, 13, 11,16
thus the missing numbers will be:
13,11,16
The axis of symmetry in a parabola is a line that's vertical that divides into 2 congruent halves.
Answer:
A
Step-by-step explanation:
The form (2x-3)(5x+9) is fully factored. To determine if it is equivalent, multiply the parenthesis out.
(2x-3)(5x+9) = 10x² - 15x + 18x - 27 = 10x² + 3x - 27
Yes this is equivalent.
The solution is A.
425 inches, Multiply all the numbers and you get the answer.