Answer:
20 days
Step-by-step explanation:
It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.
12 * 5 = 60
60/3 = 20
It will take 3 men 20 days to do the same job
Answer:
(5 x + 2) (x + 2)
Step-by-step explanation:
Factor the following:
5 x^2 + 10 x + 2 x + 4
10 x + 2 x = 12 x:
5 x^2 + 12 x + 4
Factor the quadratic 5 x^2 + 12 x + 4. The coefficient of x^2 is 5 and the constant term is 4. The product of 5 and 4 is 20. The factors of 20 which sum to 12 are 2 and 10. So 5 x^2 + 12 x + 4 = 5 x^2 + 10 x + 2 x + 4 = 2 (5 x + 2) + x (5 x + 2):
2 (5 x + 2) + x (5 x + 2)
Factor 5 x + 2 from 2 (5 x + 2) + x (5 x + 2):
Answer: (5 x + 2) (x + 2)
Answer:
b) in the vertex.
Step-by-step explanation:
In the vertex. If the parabola opens up or down the axis of symmetry is x = a where a is the x coordinate of the vertex.
If it opens to the left or right the axis is y = a where a is the y-coordinate if the vertex.
Answer:
D. $23.25
Step-by-step explanation:
=25/5
=5
=4.65*5
=23.25
So therefore your answer is D. $23.25