So, Katherine can do 0.1 of the job per hour. (if she needs 10 hours for the job, each hour she can do the whole divided by the time, so 1/10, which is 0.1)
if in two hours she and Marina can be done, then Marina will do 1(the whole job)-2/10 (twice as much as she can do in an hour)=0.8 of the job. So if Marina does 0.8 of the job in two hours, each hour she will do half of it: 0.4 - and this is the correct answer
1. True
2. True
3. False
4. False
0.375 as a decimal and 37.5 as percent
Answer: Each piece is one third (1/3)
Step-by-step explanation:
First find the slope,
m=(y2-y1)/(x2-x1)=(1-(-9))/(7-6)=10
Next, use the point slope form to find the equation:
L : y-y1=m(x-x1) => y-1=10(x-7)
[in point slope form, point is (7,1), slope=m=10 ]