1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
nataly862011 [7]
3 years ago
6

Select the correct statement(s) regarding frequency modulation (FM). a. baseband amplitude changes (information) are captured as

carrier wave frequency changes b. a device such as the voltage controlled oscillator (VCO) is required to convert signal amplitude changes to changes in frequency c. the more the carrier frequency is allowed to change (i.e., Δf), the greater the bandwidth as seen in the frequency domain d. all of the above are correct statements
Engineering
1 answer:
mario62 [17]3 years ago
3 0
<h3>All of the above statement are correct statement.</h3>

<u>Explanation</u>

  • Base-Band amplitude changes are captured as carrier wave wave frequency changes. In order to convert signal amplitude changes to changes in frequency, we need a device like VCO.
  • The bandwidth in the frequency domain increases with the change in carrier frequency.

You might be interested in
Please help me with this, picture.
Alenkasestr [34]
Maybe try 086 degrees
3 0
2 years ago
An example of the split-off point in oil, gasoline, and kerosene production is that point where crude oil is
eimsori [14]

i believe the correct answer is c but i’m sorry if i’m not correct

8 0
3 years ago
Name five or more items that were and may still be made by blacksmith
IgorLugansk [536]
Tools, weapons, hardware, armor
8 0
3 years ago
As project manager, you approve a team member’s request to change the order of their tasks because they think it will be more ef
Oduvanchick [21]

The project is going to scope if the situation happens. Option A is correct.

<h3 /><h3>What is the function of a project manager?</h3>

Project managers are in charge of organizing, planning, and guiding the execution of certain projects for an organization .

As the project manager, you grant a team member's request to rearrange their work in a way they believe will increase productivity.

However, this modification interferes with another team member's workflow since they now have to complete two more activities that are unrelated to the project's objective. The project will be within its scope.

Hence option A is correct.

To learn more about the project manager refer;

brainly.com/question/15404120

#SPJ1

6 0
2 years ago
I am trying to test out the software Classroom relay and I am just ask if there is any way kids can stop Classroom relay form se
Inessa05 [86]

Answer:

What is classroom relay?

Plz answer in ch-at

Explanation:

3 0
3 years ago
Read 2 more answers
Other questions:
  • The purpose of daytime running lights (DRLs) is to _____.
    5·2 answers
  • Write a program to control the operation of the RED/GREEN/BLUE LED (LED2) as follows: 1. If no button is pressed, the LED should
    15·1 answer
  • Automotive service P2 Wastewater Management and Handling Spins
    9·1 answer
  • B1) 20 pts. The thickness of each of the two sheets to be resistance spot welded is 3.5 mm. It is desired to form a weld nugget
    12·1 answer
  • why HF (hydrogen fluoride) has higher boiling temperature than HCl (hydrogen chloride), even thought HF has lower molecular weig
    8·1 answer
  • A small pad subjected to a shearing force is deformed at the top of the pad 0.12 in. The heigfit of the pad is 1.15 in. What is
    7·1 answer
  • A thick steel slab ( 7800 kg/m3, 480 J/kg·K, 50 W/m·K) is initially at 300°C and is cooled by water jets impinging on one of its
    14·2 answers
  • Select the correct answer.
    5·1 answer
  • 14. The flow water in a 10-in Schedule 40 pipe is to be metered. The temperature of the water is
    8·1 answer
  • What is the relationship between compressor work and COPR?
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!