The expected completion time is μ = 40 weeks.
The random variable, X = 38 weeks (the probable time)
If the standard deviation is σ, then the z-score is z = (x - μ)/σ.
Let us test the given standard deviations.
When σ=1,
z = (38-40)/1 = -2
From standard tables,
P(x<=38) = P(z<=-2) = 0.0228 =2.3%
When σ=2,
z = (38*40)/2 = -1
P(x<=38) = P(z<=-1) = 0.1587 = 15.9%
When σ=4,
z = (38-40)/4 = -0.5
P(x<=38) = P(z<=-0.5) = 0.3085 = 30.9%
Answers:
z=1 => 2.3%
z=2 => 16% (approx)
z=4 => 31% (approx)
Letter B is the answer
Number of sides (n) = 8
Apothem (a) = 18.11 units
Side (s) = 15 units
Area of Octagon = (1/2)n*a*s
A of O= (1/2)*8*18.11*15
A of O= 1086.6 units^2
Area of Square = s^2
A of S = 15^2
A of S = 225 units^2
Area of Shaded Region = A of O - A of S
A of S.R. = 1086.6 units^2 - 225 units^2
A of S.R. = 861.6 units^2
A of S.R. = 862 units^2
LETTER B