Answer:
<h2>9</h2><h3><em>
Step-by-step explanation:</em></h3><h3><em>Step-by-step explanation:you have 2 bars right ? the taller one has a frequency of 12 </em></h3><h3><em>Step-by-step explanation:you have 2 bars right ? the taller one has a frequency of 12 so the half of the taller one is 6 which is smaller than the 2nd one right ? so the frequency of the smaller one is surely greater than half of the big which is 6 so the frequency should be from 6 upwards</em> .... </h3>
Answer:
A table of values is not going to be a function if two y values have the same x value.
If you run a vertical line through the x and get 2 y values, you are not dealing with a function. The one that does that is D. You have 3 and the two y values for x = 3. Those two y values are -4 and 0.
Step-by-step explanation:
Answer:
2.8%
Step-by-step explanation:
(7.4 - 7.2) / 7.2 =
0.2 / 7.2 =
2.7777777777778%
If I'm right, then the answer would be B. 800. Hope I helped!
One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42