1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Harman [31]
3 years ago
10

The optional feature in a business letter is

Computers and Technology
1 answer:
slamgirl [31]3 years ago
5 0

Answer:

Reference

Explanation:

i don't know how to explain it but that's the answer

You might be interested in
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
Find the quotient and the remainder of 11010111 ÷ 1010, assuming that the binary numbers are signed integers in two's complement
andrew-mc [135]

Answer:

Answered

Explanation:

(11010111)_2= -32+8+2+1 = -21

value of 21 = (010101)_2

(100111)_2= -32+4+2+1= -24

value of 25 = (011001)_2

-21\times -25 = 525

525 = (001000001101)_2

5 0
3 years ago
The results of the SPEC CPU2006 bzip2 benchmark running on an AMD Barcelona has an instruction count of 2.389E12, an execution t
xxTIMURxx [149]

Answer:

inside a butt whole

Explanation:

3 0
3 years ago
In GIMP, the ( ) displays the image that the user is currently working on
kotykmax [81]
I don'r know what your trying to use? GIMP is a free photo editing software just upload it to photobucket.
7 0
3 years ago
Can be referred to as a universal network of interrelated computers which delivers a very wide variety of information and commun
nlexa [21]

Answer:

Internet

Explanation:

just took the test and got A

7 0
3 years ago
Other questions:
  • Text, numbers,graphics, sounds entered into a computer's memory during input operations are referred to as
    11·1 answer
  • What is really meant by SSDs
    9·1 answer
  • Create a derived class called Car that inherits from Vehicle. The constructor should call the base class constructor, with 4 for
    13·1 answer
  • Which of the following is not a web browser? A. safari B. explorer C. chrome D. google​
    12·2 answers
  • A cybersecurity analyst is currently investigating a server outage. The analyst has discovered the following value was entered f
    9·1 answer
  • Why, y did brainly just do that........or did it just happen to me
    12·2 answers
  • Please complete the following questions. It is important that you use complete sentences and present the questions and answers w
    12·2 answers
  • Write down the stages in the information prcessing cycle in correct order​
    5·1 answer
  • Product of -6/13 and reciprocal of -7/16 is ____________​
    7·1 answer
  • 7. Type the correct answer in the box. Spell all words correctly.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!