So, she has 3hrs to grade all papers, for 35 students.. alrite.
the first 5, she does them in 30minutes.. what's the speed rate? well, 5/30 or 1/6
now, she has still 2 hours and a half, or 150 minutes, to do the remaining 30 papers... she has to work at a rate of 30/150 then... which is 1/5 simplified.
now if we take 1/6 as the 100%, what is 1/5 in percentage then?

so 1/5 is 120% in relation to 1/6... meaning the rate of 1/5 she needs to move through, namely 1 paper every 5 minutes, is 20% faster than 1/6.
All we have to do is replace n with 4.
-6-4(4-1)
Parenthesis first.
-6-4×3
Multiplication next.
-6-12
Now subtract.
-18
The 4th term is -18.
Tell me if this helps!!
The top and sides of the cylinder have an area of pr^2+2prh, but the pr^2 of the top is also removed from the cube which has an area of 6s^2.
A=6s^2+2prh
A=6*36+2p4*1
A=216+8p in^2
A≈241.13 in^2 (to nearest one-hundredth)
Note that I did not include the area of the cylinder that touches the cube...
<h3>
Answer: y = 7</h3>
Work Shown:

Explanation:
I replaced every x with -1. Then used the order of operations (PEMDAS) to simplify. Keep in mind that
and not 
Answer:
Mean=50.25
Step-by-step explanation:
