1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
algol13
3 years ago
10

Where do -5.5 go on a number line

Mathematics
1 answer:
krok68 [10]3 years ago
8 0
See picture for the answer

You might be interested in
PLSSSSSS !!!!!!HELO ME When a transversal crosses a pair of parallel lines, which types of angle pairs are supplementary?
Volgvan

When a transversal crosses a pair of parallel lines same side interior angle pair are supplimentary.

What is angle?

Angle is the space between two intersecting lines or surface at or close to the point where they meet.

Sol-We are given that two parallel lines are intersected by  a transversal.

We have to find pair of supplementary angles.

Supplementary angle: Two angles whose sum is equal to 180 degrees are called supplementary angles.

Corresponding angles.

It is not necessary that sum of corresponding angles is always equal to 180 degrees.Therefore, pair of angles are not always supplementary.

Thus  it is true.

To know more about angle click-

brainly.com/question/25716982

#SPJ11

3 0
1 year ago
A line passes through the point (–7, 5) and has a slope of 1/2. Which is another point that the line passes through?
Andrej [43]
The answer to this question is (9,13). Here's how:
First thing you need to do is find the equation. You have a coordinate point and the slope. Remember a linear equation or formula is y=mx+b (m= slope and b= y-intercept)

So let's input the slope into the equation:
y=1/2x+b or y=0.5x+b
Notice how there is no b yet? That's because you need to find it. Good thing you have the coordinate points, so replace x and y with it. ( (x,y) = ( -7, 5) )

5=0.5(-7)+b
5= -3.5+b
+3.5 +3.5
b= 8.5
The equation is now y=0.5x+8.5 and with that equation you can now input it in a calculator to find which of the following coordinate points lies on. Or you can just input those points into the calculator. Which I did because I love to show my work. I have a picture of the work included and I really do hope I helped you. If not, message me. I'll be glad you to help you!

7 0
2 years ago
Here are the prices of five new pairs of hockey skates, in dollars: 59, 60, 65, 99, 175. The standard deviation is about $49. If
Phoenix [80]

Answer:

The standard deviation of the new data will be increased as compared to the previous standard deviation of the data.

Step-by-step explanation:

The prices are given to be : 59, 60, 65, 99, 175

Standard deviation = $49

Now, if we add or subtract any constant value to each of the terms then the standard deviation remains unchanged.

But, we add a new price in the given data that is $450

\text{New standard deviation = }\sqrt{\frac{\sum (\bar{x}-x_i)^2}{n}}\\\\\bar{x}\text{ is the mean of data after adding 450 and}\\x_i\text{ are the price values of the sample data}

Hence, Standard deviation is calculated to be 139.5

Therefore, the standard deviation of the new data will be increased as compared to the previous standard deviation of the data.

6 0
3 years ago
Read 2 more answers
Find the solution to the inequality -0.3x-5<6.7.
I am Lyosha [343]

Answer:

x > -39

Step-by-step explanation:

-0.3x < 6.7 + 5

-0.3x < 11.7

divide by -0.3

Answer is x > -39

6 0
3 years ago
Before changes to its management staff, an automobile assembly line operation had a scheduled mean completion time of minutes. T
Sergio [31]

No, we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Given mean of 15.5 minutes , standard deviation of 1.7 minutes, sample size of 90 and sample mean of 15.4 minutes.

We can do the following study for conclusion:

Firstly the null hypothesis is

H_{0}: x=15.5

The alternate hypothesis is

H_{1}: x < 15.5

since the value is less than this is a one tailed test.

Z=x bar-x/d/\sqrt{n}

where x is sample mean and d is standard deviation.

Z=15.4-15.5/1.7/\sqrt{90}

=-0.1/1.7/9.4868

=-0.560

Critical value of Z at 0.1 level of significance

Z=-1.28

We fails to reject the null hypothesis since -0.560>-1,28

Hence we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Learn more about hypothesis at brainly.com/question/11555274

#SPJ4

Question is incomplete. It should include:

mean of 15.5 minutes ,

standard deviation of 1.7 minutes,

sample size of 90

and sample mean of 15.4 minutes.

5 0
1 year ago
Other questions:
  • Write the next two terms in the pattern. 3, 10, 17, 24, . . .
    7·2 answers
  • (URGENT!!!!) could I have the answer to part B please ?
    15·1 answer
  • Find the area of this parallelogram in (cm2).
    10·1 answer
  • Antonio purchased adult and child tickets for the fair. Tickets cost $29.35 for each adult and $17.45 for each child. Let x repr
    11·2 answers
  • (a) Draw the image of PQR after a rotation of 180° about the origin. Label the image P'Q'R' .
    15·2 answers
  • Two quadratic functions are shown.
    9·2 answers
  • For w(x)=-2x+7, find the value of x which w(x)=-3
    6·2 answers
  • How do find Herons formula?
    13·1 answer
  • Unit #2 - Lesson #7 Exit Ticket: Solve the equation shown below for the variable x. Place your answer in the answer box.
    15·2 answers
  • A multiplication expression with a product of 108,064 is shown below. What is the missing digit? four thousand nine hundred twel
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!