Answer:
What is the average rate of change from x = −4 to x = 1? x= -4 x + 5
Answer:
75 students
Step-by-step explanation:
500 students x 0.25 (25%) = 125 play baseball
500 students x 0.10 (10%) = 50 play soccer
125 who play baseball - 50 who play soccer = 75 more students who play baseball
Answer:
6.18% of the class has an exam score of A- or higher.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

What percentage of the class has an exam score of A- or higher (defined as at least 90)?
This is 1 subtracted by the pvalue of Z when X = 90. So



has a pvalue of 0.9382
1 - 0.9382 = 0.0618
6.18% of the class has an exam score of A- or higher.
Answer:
1/2 a bag
Step-by-step explanation:
1/2 a piece is smaller than 1/2 a bag because the bag is bigger