Answer:
285 words
Step-by-step explanation:
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
To do this we need to move 10 to other side. To accomplish this you just need to add 10 to both side since (-10)
so
A+ 10 = c -10 + 10
we get
A+ 10 = c
lets say it wasn't -10 but positive 10.
A = c + 10 then we would subtract 10 from both sides
A -10 = c + 10 - 10
we get
A - 10 = C
The Coefficient is 2.
The Constant is 4.
The Variable is x.