Answer:
3/180= 60 seconds = 1m/per cut or 60 sec/per cut.
Step-by-step explanation:
This is 3 cuts executed from a board to get 5 parts.
Answer:
85.9
Step-by-step explanation:
The probability that a randomly selected customer will have to wait between 32 minutes and 37 minutes is 59.81%
<h3>What is an
equation?</h3>
An equation is an expression that shows the relationship between two or more numbers and variables.
Z score is given by:
z = (raw score - mean) / standard deviation
Given mean of 36 minutes and a standard deviation of 3 minutes.
For x = 32:
z = (32 - 36)/3 = -1.33
For x = 37:
z = (37 - 36)/3 = 0.33
P(-1.33 < z < 0.33) = P(z < 0.33) - P(z < -1.33) = 0.6179 - 0.0198 = 0.5981
The probability that a randomly selected customer will have to wait between 32 minutes and 37 minutes is 59.81%
Find out more on equation at: brainly.com/question/2972832
#SPJ1
Answer:
0.0
Step-by-step explanation:
Used a calculator
As long as 2 opposite sides are the same and the other two opposite sides are the same. eg. 6,6,2 &2 / 1,1,7 & 7 and so on