To find the cost per yard, divide the cost by the amount:
p: 6.25 / 6.5 = 0.96 --> The cost per yard is $0.96
r: 3 /4 = 0.75 --> The cost per yard is $0.75
b: 8.1 /8.5 = 0.95 --> The cost per yard is $0.95
s: 7.2 / 6 = 1.2 --> The cost per yard is $1.20
In order from cheapest to most expensive:
Red
Brown
Purple
Silver
Hope this helps.
The number is 69.3 because percent means 0.01, so 10 x 0.01 = 1.1
so 1.1 x 63 = 69.3. you can also do 63 x 10% = 69.3.
Given:
A company wants to select 1 project from a set of 4 possible projects.
Consider the options are:
a.
b.
c.
d. 
To find:
The constraints that ensures only 1 will be selected.
Solution:
It is given that the company wants to select 1 project from a set of 4 possible projects. It means the sum of selected projects must be equal to 1.

Therefore, the correct option is (a).
5z^2 + 16
a coefficient is a number multiplied by a variable (a letter). so there is only ONE coefficient in this expression and it is 5.