First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
(1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour.
Answer:
2.8 hours
Step-by-step explanation:
Distance = rate * time
If the west-bound train travels at a rate of 80 mph for t hours, then the distance it travels is 80t.
If the east-bound train travels at a rate of 90 mph for t hours, then the distance it travels is 90t.
The distance between the trains after t hours is 476; therefore, the distance of the west-bound train plus the distance of the east-bound train equals the total distance between them, 476:
80t + 90t = 476 and
170t = 476 so
t = 2.8 hours
Answer:it is d because on the chart it is 5 and 2 and your round
Step-by-step explanation:7 times 5 28 equal 30 hope helped correct if wrong
Answer:
3^3 and 36^1
Step-by-step explanation:
3x3x3x3 is multiplying that 4 times so it is to the power of 4
36 is just once so it is to the power of one
Ur answer would be B.. Hope it helps let me know if its right or not!