Step-by-step explanation:
<u>Step 1: Set up</u>
75 + 120 + 90 + ∠4 = 360
<u>Step 2: Solve</u>
- Add: 285 + ∠4 = 360
- [Subtraction Property of Equality] Subtract 285 on both sides: ∠4 = 75
Speed=distance/time
suppose the distance of the first day is d, and the time is t
distance of the second day: d+0.17d=1.17d
time of the second day: t+0.2t=1.2t
speed of the second day: 1.17d/1.2t=0.975(d/t)=(1-0.025)(d/t)
so the speed of the second day is 2.5% slower than the first day.
Duration, time taken, the completion time
the answer is c i used a algebra calculator