1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dimulka [17.4K]
3 years ago
11

What is the measure of an angle formed by the angle bisector of a given angle and one of its sides: 171°30'

Mathematics
2 answers:
FrozenT [24]3 years ago
6 0

An angle bisector is one that cuts an angle into two equal halves.

bearing in mind that a degree has 60 minutes and a minute has 60 seconds, so then 171°30' is just 171 degrees and 30 minutes.

let's halve each, 171 ÷ 2 = 85.5°, so 85.5° is really 85° and half of another degree, let's recall that a degree has 60 minutes, so half of a degree is just half of 60 minutes, namely 30 minutes, so 85.5° is really 85°30'.

let's halve the 30 minutes now, half of 30 is 15, so 15 minutes is its half.

now let's add both halves together, 85°30' plus 15', 85°45'.

m_a_m_a [10]3 years ago
6 0

85.75° or 85°45'

You have 171°30' so you just cut it in half. 171°30' is the same as 171.5°. 171.5 divided by 2 is 85.75. There's your answer.

You might be interested in
In what form is the equation y=7=3/4(x-5) written?
jeka94
The answer to the question is point slope form
3 0
3 years ago
Can someone pls i will give brainliest :)
satela [25.4K]

Answer:

149 degrees

Step-by-step explanation:

<u>Higher value: </u>

114

<u>Lower value:</u>

-35

<u>Finding the difference:</u>

114 - (-35)

114 + 35

149

6 0
2 years ago
Read 2 more answers
Use the zero product property to find the solutions to the equation x2 + x – 30 = 12.
Butoxors [25]

Answer:

x= 6, -7

Step-by-step explanation:

3 0
3 years ago
A company is planning to manufacture snowboards. The fixed costs are $ 100$100 per day and total costs are ​$55005500 per day at
Rama09 [41]

Answer:

The equation for total cost function is

C(x)=100+270x

Step-by-step explanation:

Variable cost per per board =total cost per day-fixed cost per day/daily output

total cost per day is $5,500

fixed cost per day is $100

20 boards are produced per day

variable cost per board=($5,500-$100)/20=$270 per day

Total cost C(x)=fixed cost per day+ variable per board*number of daily output

Since daily output is represented also by x ,total cost function is given thus:

C(x)=100+270x

4 0
3 years ago
.Write 803,000,000 in scientific notation.
Rina8888 [55]

Answer:

8.03*(10^8)

Step-by-step explanation:

6 0
3 years ago
Other questions:
  • If x-y=10 and x squared-y squared =40 then y=?
    10·2 answers
  • An investor bought some shares at a price of £14.88 each. The price of the shares drops to £11.45. Find the percentage loss.
    8·1 answer
  • Which equation is related to to x + 16 = 48?
    13·2 answers
  • Write an inequality to show how much more needs to be saved to reach $100?
    10·2 answers
  • You have 40 minutes to exercise at the gym, and you want to burn 300 calories total using both
    14·1 answer
  • Ceasar opens a bank account and makes an initial deposit of $800. The banker tells Ceasar that he is going to receive an annual
    6·1 answer
  • How long would it take to travel 315 mi at the rate of 45 mi/h
    6·1 answer
  • HELPPP
    10·1 answer
  • 2 sss, aas, sas, or not enough information
    12·1 answer
  • On the scale drawing of a car, the length from bumper to bumper is 6 inches. The car’s actual length, from bumper to bumper, is
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!