Answer: yes your right good job!
Step-by-step explanation:
The answer to this question is 2 because 3-3=0×6=0+2=2
2/3, 4/5, 1/8 is the correct order from greatest to least.
The average wait time is simply the averages of all the wait times in a product category. For instance, a custom watch manufacturer might have a wait time that ranges from 5 days to 10 days for a model A watch depending on the options. The average wait time for the model A watch is 7.5 days.
I think it’s 40
The width is 8
And the length is 5
8 x 5 is 40