<span>3 is 1.0 below the mean. That is 1.0 / 0.9, or 1.1111... standard deviations below the mean.
So look up z < -1.11 on your graphing calculator.
It should be around 0.1335 or 13.35%</span>
The answer is the answer is C and F.
This is found by inserting the equation above into the quadratic formula or -b plus or minus the square root of b^2 - 4ac over 2a.
With that, you find that the first number is a -3, which eliminates choices B and D.
Then, solving the 4ac portion, you find that inside the square root the number is 29, which gives you the last two answer choices.
Hope this helps!
Answer:
We know that one Saturday comes in a week there are 7 days in a week and there are 4 weeks in a month so in 7×4=28 days four Saturdays will come ,
But since July has 31 days so there is a possibility of 5 Saturdays as in the rest 2 days one can be Saturday. so theres a possibility of 5 Saturdays
Answer:
The 99% confidence interval = (126.93,157.67)
Step-by-step explanation:
The formula for Confidence Interval =
Mean ± z × Standard deviation /√n
Mean = 142. 3 mmHg
Standard deviation = 20.8 mmHg.
n = 12
Z score for 99% confidence interval = 2.56
Confidence Interval =
142.3 ± 2.56 × 20.8/√12
142.3 ± 2.56 × 6.0044427996
142.3 ± 15.371373567
Confidence Interval
= 142.3 - 15.371373567
= 126.92862643
≈ 126.93
142.3 + 15.371373567
= 157.67137357
≈ 157.67
Therefore, the 99% confidence interval = (126.93,157.67)