1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
muminat
3 years ago
12

The ______ of a vector v is produced by subtracting the coordinates of the initial point from the corresponding coordinates of t

he terminal point.
Mathematics
1 answer:
Alla [95]3 years ago
4 0

Answer:

< y_2-y_1,x_2-x_1>

Step-by-step explanation:

Let the coordinate of initial point is (x_1,y_1) and the final that is coordinate of the terminal point is (x_2,y_2) we have to find the vector which formed by subtraction of final point that is terminal point and the initial point

So the vector will be < y_2-y_1,x_2-x_1>

You might be interested in
What scale factor is shown in the graph?
oee [108]
The answer is 1/2 the last one
7 0
3 years ago
Read 2 more answers
Help pls 6th grade math i will give brainliest
SCORPION-xisa [38]

Answer:

G because y+y+y is the exact same as 3 y

5 0
3 years ago
Read 2 more answers
Diego takes more than twice as long to assemble a computer as Kenneth does. Kenneth assembles a computer in 24 minutes. If Diego
Anastasy [175]
The answer to this problem is D<span />
6 0
3 years ago
!!!! I need help with numbers 1 and 9 please !!!!!
Nataly_w [17]

(1)

given \frac{j}{6} = \frac{9}{10} ( cross- multiply )

10j = 54 ( divide both sides by 10 )

j = \frac{54}{10} = \frac{27}{5} ← in simplest form

(9)

let h be the hours worked daily , then

3h = 20 \frac{2}{3} = \frac{62}{3} ( divide both sides by 3 )

h = \frac{62}{3} ÷ 3

  = \frac{62}{3} × \frac{1}{3} = \frac{62}{9} = 6 \frac{8}{9}

She worked  6 \frac{8}{9} hours each day


5 0
3 years ago
Because of hiring a plumber, y, to work x hours on a repair project can be modeled using a linear function. the plumber charges
seraphim [82]

Answer:

The plumbers cost would be equal to the equation 80+45x=y with y being the total amount of money he made and x being how many hours he worked.

Step-by-step explanation:

In this equation to find the amount the plumber was paid all you need to do is plug in the amount of hours he worked for x.

If the plumber worked his maximum of 8 hours then the equation would change from 80+45x=y to 80+(45×8)=440.

So, if the plumber worked for 8 hours he would make $440.

4 0
3 years ago
Other questions:
  • Given that the points (16, -5) and (-40, 16) lie on a line, what is the equation of the line? select TWO answers.
    6·1 answer
  • PLEASE HELP ME!!
    12·1 answer
  • What is the rate of change to 2y=14x+6
    6·1 answer
  • Suppose you start at the origin, move along the x-axis a distance of 6 units in the positive direction, and then move downward a
    12·1 answer
  • Jasper slices a cone and the cross section is a triangle. How could Jasper have made the slice?
    11·1 answer
  • Find the slope between two points ( -2,4) 3,-6)
    11·2 answers
  • What should the following equation be multiplied by in order to eliminate the fractions? 2y/3+1/3=y/2+1/6
    13·1 answer
  • Find x so that l || m. Show your work.​
    7·1 answer
  • Please help me, i need to finish
    12·1 answer
  • In the coordinate plane, the points A(-8, -6), B(-9, 11), and C(3. - 7) are reflected over the y-axis to the points A, B, and C'
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!