1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
OverLord2011 [107]
3 years ago
15

I NEED HELP DONT COMMENT IF YOU'RE DONT KNOW

Mathematics
1 answer:
stepan [7]3 years ago
6 0
<span>12.6≤<span>g+17.4</span></span>  Flip the equation.<span><span>  g+17.4</span>≥12.6</span>  Subtract 17.4 from both sides.<span><span><span>  g+17.4</span>−17.4</span>≥<span>12.6−17.4</span></span><span>  g≥<span>−4.8</span></span>   Answer:  <span>g≥<span>−<span>4.8</span></span></span>
You might be interested in
What is the equation of a line with a slope of 7 and a point (1, 8) on the line?
stira [4]
Slope: 7   given point: (1,8)

y = 7x + b          step 1 - plug in the slope in the formula
8 = 7(1) + b       step 2 - plug in the given point
8 = 7 + b           step 3 - simplify the expression
b = 1                 step 4 - solve for b
y = 7x + 1         step 5 - plug in b

formula: y = 7x + 1
6 0
4 years ago
Solve plzzzzz<br> -7+11p=3p-47
Setler79 [48]

Answer:

p = -5

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
What is the value of x in the product of powers below?
Luda [366]
-7
Bbbbbbbbbbbbbbbbbbbbbb
7 0
4 years ago
HELP. How much water is needed to fill a water tank that is 15 feet long, 8 feet wide, and 4 feet deep.
TiliK225 [7]

Answer: 60

Step-by-step explanation: I did the math but sorry if this is wrong

6 0
3 years ago
Read 2 more answers
Suppose that your business is operating at the 4.5-Sigma quality level. If projects have an average improvement rate of 50% annu
Luda [366]

Answer:

  11.75 years

Step-by-step explanation:

If we ignore the fact that "6-sigma" quality means the error rate corresponds to about -4.5σ (3.4 ppm) and simply go with ...

  P(z ≤ -6) ≈ 9.86588×10^-10

and

  P(z ≤ -4.5) ≈ 3.39767×10^-6

the ratio of these error rates is about 0.000290372. We're multiplying the error rate by 0.5 each year, so we want to find the power of 0.50 that gives this value:

  0.50^t = 0.000290372

  t·log(0.50) = log(0.00290372) . . . . take logarithms

  t = log(0.000290372)/log(0.50) ≈ -3.537045/-0.301030

  t ≈ 11.75

It will take about 11.75 years to achieve Six Sigma quality (0.99 ppb error rate).

_____

<em>Comment on Six Sigma</em>

A 3.4 ppm error rate is customarily associated with "Six Sigma" quality. It assumes that the process may have an offset from the mean of up to 1.5 sigma, so the "six sigma" error rate is P(z ≤ (1.5 -6)) = P(z ≤ -4.5) ≈ 3.4·10^-6.

Using that same criteria for the "4.5-Sigma" quality level, we find that error rate to be P(z ≤ (1.5 -4.5)) = P(z ≤ -3) ≈ 1.35·10^-3.

Then the improvement ratio needs to be only 0.00251699, and it will take only about ...

  t ≈ log(0.00251699)/log(0.5) ≈ 8.6 . . . . years

5 0
3 years ago
Other questions:
  • Use elimination to solve each system of equations.
    7·1 answer
  • Find an equation for the ellipse that satisfies the given conditions.
    14·1 answer
  • Recall what you know about similarity. If circle B is similar to circle A, what must exist?
    15·2 answers
  • The area of a square can be found using the equation A = s², where A is the area and s is the measure of one side of the square.
    13·2 answers
  • Find the quotient 8 divided by 240
    6·2 answers
  • A boat as a buoyant force of 260 N and weight of 80N what is the maximum weight capacity that is allowed on the boat to allow it
    12·2 answers
  • Answer please due this second
    11·1 answer
  • If APTS – APQR, find the value of x.<br> 3x - 8<br> P<br> 28<br> T<br> 21<br> x +11<br> S<br> R
    13·1 answer
  • Plz help me well mark brainliest if correct.................
    7·1 answer
  • Solve the system of linear equations by graphing. Check your solution.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!