1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Brrunno [24]
3 years ago
6

Find the slope of line passing through the points (4,8) and (6, -2).

Mathematics
2 answers:
Lady_Fox [76]3 years ago
5 0
The slope is -5 if i am not mistaken.
erastovalidia [21]3 years ago
4 0
The slope formula is m= ( Y2-Y1)/ (X2­-X1) 

X1 =4
X2=6
Y1=8
Y2=(-2)

((-2)-8)/(6-4)= (-10)/(2)=-5

You might be interested in
I REALLY NEED HELP ASAP!!!
kkurt [141]

m<P would be:

25

but m<PQC I forgot how to do... sorry!

8 0
3 years ago
HELP PLEASE !!!
Lana71 [14]
972-4=968 and 62-4=58
The highest common number between 968 and 58 is 2 so 968 in fractions is 484/2 and 58 is 29/2

If you multiply these two together you will get 14036/2
5 0
3 years ago
A package contains 6 cups of cereal. Each serving is 1/4 cup of cereal. How many serving are there in all?
Marina CMI [18]

Answer:

1 and 2/4 I think

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
30 POINTS AND BRAINLEST!!!!!!
irinina [24]
600 in3

Work:
8•15
120•10
1200/2

=600in3
4 0
3 years ago
A construction company showed that the strength, y, of concrete, measured
Vilka [71]

Answer:

  a) y-intercept = 17; initial design strength percentage

  b) slope = 2.8; increase in that percentage each day

  c) 29.6 days to 100% design strength

Step-by-step explanation:

a, b) The equation is in the form called "slope-intercept form."

  y = mx + b

where the slope is m, and the y-intercept is b.

Your equation has a slope of 2.8 and a y-intercept of 17.

The y-intercept is the percentage of design strength reached 0 days after the concrete is poured. The strength of the concrete when poured is 17% of its design strength.

The slope is the percentage of design strength added each day after the concrete is poured. The concrete increases its strength by 2.8% of its design strength each day after it is poured.

__

c) To find when 100% of design strength is reached, we need to solve for x:

  100 = 2.8x +17

  83 = 2.8x

  83/2.8 = x ≈ 29.6

The concrete will reach 100 percent of its design strength in about 30 days.

8 0
3 years ago
Other questions:
  • En la región Ica se ha instalado un
    12·1 answer
  • Deshawn draws a regular pentagon and rotates it about its center.
    6·2 answers
  • Camden is working two summer jobs, making $10 per hour babysitting and making $18 per hour lifeguarding. In a given week, he can
    9·1 answer
  • What is a y intersection bc ia m learning that and just wow
    7·2 answers
  • Factor the trinomial by grouping.<br> 6x^2 - 7x-20
    10·1 answer
  • Pls help lol uh<br><br> thanks if you do im very confused
    7·2 answers
  • NEED ANSWER ASAP !!
    11·1 answer
  • The weights of items produced by a company are normally distributed with a mean of 4.5 ounces and a standard deviation of 0.3 ou
    6·1 answer
  • How to solve this equation?<br> X^2=20
    15·2 answers
  • Proving the Congruent Supplements Theorem
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!