Answer:
Mean = 78.2
Standard deviation = 5.8
Step-by-step explanation:
Mathematically z-score;
= (x-mean)/SD
From the question;
12% of test scores were above 85
Thus;
P( x > 85) = 12%
P(x > 85) = 0.12
Now let’s get the z-score that has a probability of 0.12
This can be obtained from the standard normal distribution table and it is = 1.175
Thus;
1.175 = (85 - mean)/SD
let’s call the mean a and the SD b
1.175 = (85-a)/b
1.175b = 85 - a
a = 85 - 1.175b ••••••••(i)
Secondly 8% of scores were below 70
Let’s find the z-score corresponding to this proportion;
We use the standard normal distribution table as usual;
P( x < 70) = 0.08
z-score = -1.405
Thus;
-1.405 =( 70-a)/b
-1.405b = 70-a
a = 70 + 1.405b ••••••(ii)
Equate the two a
70 + 1.405b = 85 - 1.175b
85 -70 = 1.405b + 1.175b
15 = 2.58b
b = 15/2.58
b = 5.81
a = 70 + 1.405b
a = 70 + 1.405(5.81)
a = 78.16
So mean = 78.2 and Standard deviation is 5.8
Answer:
x = y/3 plus 1/3
Step-by-step explanation:
isolate the variable by dividing each side by factors that dont contain the variable.
Answer:
The length of the tunnel is 7.66667 inch
Step-by-step explanation:
We are given
1 inch =60 miles
now, we can find for 1 mile
so,
60 miles = 1 inch
we get

we are given
total length is 460 miles
so, we can multiply both sides by 460

now, we can simplify it

So,
The length of the tunnel is 7.66667 inch