Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
Answer:
X = 6 1/2
Step-by-step explanation:
X is equal to 6 1/2 because, if you subtract 3 1/2 from 10 you will be left with 6 1/2.
The Cost of installing the artificial soccer pitch is $5360
A rectangle is a quadrilateral (has four sides and four angles) in which opposite sides are parallel and equal.
The soccer pitch us rectangle in shape. Hence:
Perimeter of soccer pitch = 2(length + width) = 2(91 + 43) = 268 meters
Cost of installing the pitch = $20 per meter * 268 meters = $5360
The Cost of installing the artificial soccer pitch is $5360
Find out more on perimeter at: brainly.com/question/16596982
Let's assume that the original length of the piece of board is L.
Now you cut two pieces that are 3.4 ft long, so the remaining piece of board is:
L - 3.4ft - 3.4ft = L - 6.8ft long.
Now we know that the remaining must be 2.35 times longer than the pieces of 3.4 ft, then we have the equation:
( L - 6.8ft) = 2.35×3.4ft
solving that for L we get:
L = 14.79ft
Rounding to the nearest tenth, we get:
L = 14.8ft
You should buy a piece of board that is 14.8 feet long.
If you want to learn more, you can read:
brainly.com/question/22293035