Answer: No
Step-by-step explanation:-
Labeled diameter on the bolt = 0.35 inch
The observed diameter of the bolt= 0.33 inch


For the bolt to be in the package, the percent error must be less than 5%. As the percent error is 6.06% which is greater than 5%, the bolt cannot be in the package.
Answer:
By dividing the top number by the bottom.
Step-by-step explanation:
ummmmm
Answer:
$1.40 per pint
Step-by-step explanation:
4 cups is the same as 2 pints.
If 2 pints cost $2.80
divide $2.80 by 2
and get $1.40 per pint
Answer:
4 Hours
Step-by-step explanation:
Let's say that the rate of the machines 1/x, because every time they complete an order, it takes them x hours. To find x, we have to add the the rates of the individual machines, which would equal the rate of the machines working together. We know that there are four machines working together at the same rate, and it took them 32 hours.
So:
1/x + 1/x + 1/x + 1/x = 1/32
1/4x = 1/32
4x = 32
x = 8
Thus, the rate of the machines is 1/8.
Now we have to find the time of the order with only half of the machines working together. This time, we don't know the combined rate, so I'll substitute it for y.
1/8 + 1/8 = 1/y
1/4 = 1/y
y = 4
The time taken to complete it is 4 hours.
Here is your answer
A. 1,3,5,7,9,11,.....
REASON :
In an AP their is a common difference between two consecutive terms.
i.e. t2-t1=t3-t2=t4-t3=....= constant
The option A satisfies above condition.
HOPE IT IS USEFUL