Answer:
z(max) = 256000 Php
x₁ = 10
x₂ = 110
Step-by-step explanation:
Jogging pants design Selling Price Cost
weekly production
Design A x₁ 2500 1750
Design B x₂ 2100 1200
1. z ( function is : )
z = 2500*x₁ + 2100*x₂ to maximize
First constraint weekly production
x₁ + x₂ ≤ 120
Second constraint Budget
1750*x₁ + 1200*x₂ ≤ 150000
Then the model is
z = 2500*x₁ + 2100*x₂ to maximize
Subject to
x₁ + x₂ ≤ 120
1750*x₁ + 1200*x₂ ≤ 150000
General constraints x₁ ≥ 0 x₂ ≥ 0 both integers
First table
z x₁ x₂ s₁ s₂ cte
1 -2500 -2100 0 0 0
0 1 1 1 0 = 120
0 1750 1200 0 1 = 150000
Using AtoZmath online solver and after 6 iterations the solution is:
z(max) = 256000 Php
x₁ = 10
x₂ = 110
Answer:
The actual distance between the houses is 18.9 miles.
Step-by-step explanation:
The exact question is as follows :
Given - On a map, 1 inch equals 5.4 miles. Two houses are 3.5 inches apart on the map.
To find - What is the actual distance between the houses?
Solution -
Given that,
1 inch = 5.4 miles
⇒3.5 inches = 3.5 × 5.4 miles
= 18.9 miles
∴ we get
The actual distance between the houses is 18.9 miles.
Answer:
A function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Step-by-step explanation:
Work done to lift the rope by distance x feet:

Work done to lift the bucket by distance x feet:

On reaching top 7 gallons of water spilled out so , on going up by x feet
gallons of water spilled out.
a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground:

Now the work to get the bucket to the top of the cliff i.e. x =35

W=3726
Hence, a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Answer:
-11.5
Step-by-step explanation:
4(x-2/3)=-18
4x-8/3=-18
4x-8=-18×3
4x-8=-54
4x=-54+8
4x=-46
x=-46/4
x=-11.5
Answer:
Read below
Step-by-step explanation:
(2)2(−4)3. (2)3 +(−4)2. Substitute 2 for x and −4 for y. 4(−64). 8+16. = −256 ... An equation is a term used to describe a collection of numbers and variables related ... gives us a set of coordinate points that we can plot to create a graph of the function. ... The tick-marks on the number line represent evenly spaced integers.