D. 3 to 5
This is because if you simplify the ratio by dividing each number in the ratio by 4, therefore for every group of 5 birds 3 of them are parrots
The measure of each exterior angle is 60° and the polygon has 6 sides ⇒ 4th answer
Step-by-step explanation:
In a regular n-side polygon:
- All sides are equal in lengths
- All angles are equal in measure
- The measure of each interior angle =

- The measure of each exterior angle =

- The sum of interior angle and exterior angle at a vertex is 180°
∵ The measure of an interior angle of a regular polygon is 120°
∵ The sum of interior angle and exterior angle at a vertex = 180°
∴ The measure of each exterior angle = 180 - 120
∴ The measure of each exterior angle = 60°
∵ The measure of each exterior angle = 
- Substitute the measure of the exterior angle by 60
∴ 
- By using cross multiplication
∴ 60 n = 360
- Divide both sides by 60
∴ n = 6
∴ The polygon has 6 sides
The measure of each exterior angle is 60° and the polygon has 6 sides
Learn more:
You can learn more about polygons in brainly.com/question/6281564
#LearnwithBrainly
Answer:
Original side of triangle = 6 units
Step-by-step explanation:
Given:
Perimeter = 45 units
Scale factor = 2.5 (Increase)
Find:
Original side of triangle = ?
Computation:
Original Perimeter = Perimeter / Scale factor
Original Perimeter = 45 units / 2.5
Original Perimeter = 18 units
Perimeter of an equilateral triangle = 3 (Side)
18 units = 3 (Side)
Side = 6 units
Original side of triangle = 6 units
Answer:
67/100
Step-by-step explanation:
67÷100 Divide the numbers
0.67 then move the decimal point to the right
6.7 *10 this will give you the fraction
Answer:
B. The Gantt chart
Step-by-step explanation:
The best chart that would best fulfill Julius's requirement is the Gantt chart
A Gantt chart is a type of chart that is used to give a visual illustration of tasks or project schedule for a particular time. Gantt chart is a special bar chart plot with the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. Gantt charts are used for planning projects of all sizes. They show the start date of the project, the list of project tasks, the people working on each task, start and finish time for the tasks, grouping of the tasks, tasks linkage and progress of the tasks.