Temperature is a measure of the average kinetic energy of the particles of a substance.
Hope this helps! :)
amount of work done is 5880 J
Given:
mass of object = 50kg
Final height = 20m
initial height = 8m
To Find:
amount of work done
Solution:
work is done when a force acts upon an object to cause a displacement. You can calculate the energy transferred, or work done, by multiplying the force by the distance moved in the direction of the force.
The work done by gravity is given by the formula,
W = mgh
W = 50 x 9.8 x ( 20-8)
= 5880 J
So the work done is 5880 J
Learn more about Work done here:
brainly.com/question/25239010
#SPJ4
<h3>
Answer:</h3><h3>we can say that:-</h3>
- A reading with more no of significant figures is considered to be more precise.
- Kyra recorded a reading of 24.3 sec. Since all non 0 digits are considered to be significant this reading has 3 significant figures.
- Pari recorded a reading of 24 sec. Since all non 0 digits are considered to be significant this reading has 3 significant figures.
<h3>hence we can say that kyra's reading has more significant figures nd so it is more precise.</h3>
The force equation can easily prove this. F=ma. This states that the force on an object is equal to mass times acceleration. If the mass stays the same and the velocity of the cars increases than that means there is a larger force. This is because in both cases the cars are stopping in almost an instant and the times of the crashes are theoretically identical. Acceleration is the change in velocity over time. If the velocity is higher with the same amount of time than that means there is a higher acceleration. If you plug a higher acceleration into the force equation then you wind up with a higher force and in turn a more damaging collision.
<span />
The distance from the Earth to the Sun is 92.96 million mi.