1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
yarga [219]
3 years ago
12

At NikeID, you can design your own athletic shoes by selecting the material, choosing the color and even adding other personal t

ouches. This method of using machines to do multiple tasks to produce a variety of products is known as _______ manufacturing.
Business
1 answer:
kondaur [170]3 years ago
4 0

Answer: flexible manufacturing

Explanation: Flexible manufacturing is the type of manufacturing system employed at NikelD, wherein customers through customization can design their own athletic shoes. As such, there is usually equipment and computerized systems  configured to manufacture a variety of parts and handling changing levels of production. Doing this serves to improve efficiency while lowering the company's production costs significantly and is a characteristic feature of make-to-order strategies requiring a high degree of customization by customers. This system of manufacturing also creates a method of production designed to adapt to changes in the type and quantity of the product being manufactured very easily.

You might be interested in
How have graeter's owners used the four factors of production to build the business over time?
Kaylis [27]
The Graeter's proprietors utilized the four elements of generation to fabricate the business after some time. The four components are arrive, work, capital, and business enterprise. The land is utilized on the grounds that they based the underlying start-up of the organization through their own particular home. They didn't utilize any cash attempting to set up their business.
6 0
3 years ago
Clarissa wants to fund a growing perpetuity that will pay $6000 per year to a local museum, starting next year. She wants the an
likoan [24]

Answer:

She needs $150,000 to fund this perpetuity.

Explanation:

In this question we need to find the present value of this perpetuity. Because this is a growing perpetuity we will need to use the formula of present value of a growing perpetuity.

PV of growing perpetuity = Payment/ R-G

The payment is the current payment the perpetuity will pay which is 6,000, R is the interest rate which is 10% and G is the growth rate of the perpetuity which is 6%. Now we will input these values in the formula in order to find the present value of the perpetuity.

6,000/0.1-0.06

=6,000/0.04

=150,000

4 0
3 years ago
(Predetermined OH rates; capacity measures) Albertan Electronics makes inexpensive GPS navigation devices and uses a normal cost
Jet001 [13]

Answer:

Albertan Electronics

a. Albertan Electronics’ predetermined variable OH rate is $20.50.

b. The predetermined FOH rate using practical capacity is $8.00.

c.  The predetermined FOH rate using expected capacity is $12.00.

d1.  The variable overhead applied is $1,375,000.

d2. The fixed overhead applied using the rate in (b) is $880,000.

d3. The fixed overhead applied using the rate in (c) is $1,320,000.

d4. The total under-applied overhead for 2010 at $8.00 FOH rate is $455,000 and the total under-applied overhead for 2010 at $12 FOH rate is $15,000.

Explanation:

a) Available 2010 budgeted data:

Variable factory overhead at 100,000 machine hours $1,250,000 ($12.50)

Variable factory overhead at 150,000 machine hours 1,875,000 ($12.50)

Fixed factory overhead at all levels between 10,000 and 180,000 machine hours  = 1,440,000 ($8.00)

Practical capacity is 180,000 machine hours; expected capacity is two-thirds of practical (120,000) = $12 ($1,440,000/120,000)

Predetermined Overhead Rate:

Variable factory overhead =         $12.50

Fixed factory overhead =                 8.00

Predetermined overhead rate = $20.50

During 2010, the firm records 110,000 machine hours and $2,710,000 of overhead costs. How much variable overhead is applied? How much fixed overhead is applied using the rate found in part (b)? How much fixed overhead is applied using the rate found in part (c)? Calculate the total under- or overapplied overhead for 2010 using both fixed FOH rates.

Variable overhead applied = $12.50 * 110,000 =    $1,375,000

Fixed overhead applied with $8 * 110,000 =               880,000

Total overhead applied                                          $2,255,000

Underapplied overhead = ($2,710,000 -2,255,000) 455,000

Variable overhead applied = $12.50 * 110,000 =    $1,375,000

Fixed overhead applied with $12 * 110,000 =           1,320,000

Total overhead applied                                          $2,695,000

Underapplied overhead = ($2,710,000 -2,695,000)    15,000

6 0
3 years ago
If one worker produces 15 cones of ice cream in an hour, two workers produce 25 ice cream cones, and three workers produce 30 ic
Setler [38]

Answer:

The marginal return of production of the second worker or marginal product of the second worker is 10 cones.

Explanation:

One worker can make 15 cones of ice cream in an hour.

Two workers can make 25 cones in the same time.

While three workers can make 30 cones in an hour.

The marginal return of the production of the second worker is the contribution of the second worker in the total output.

Marginal return

= 25 cones - 15 cones

= 10 cones

5 0
3 years ago
If Melissa decides to sell the best ice cream on earth, and intends to establish a strong ethical climate in her organization, d
vekshin1

Answer:

planning stage of marketing cycle                              

Explanation:

The planning stage is that when the operation proposals are recorded, the project deliver-ability and specifications are determined, and the timetable for the program is set. It means creating a set of policies to help direct your team through the stages of project application and completion.

To put it another way, project preparation applies to all you do to set up your project for success. It's the phase you're going through to determine the steps needed to establish your project priorities, describe the scope of what needs to be done and build the task list to do that.

8 0
3 years ago
Other questions:
  • What does the purchaser of a product obtain besides the good service or idea itself?
    7·2 answers
  • Engaging directly with the customer costs a business less in advertising then using traditional channels such as magazines and b
    15·1 answer
  • Mateo has a passion for collecting old watches. He's particularly interested in those from the 1920s because they have a history
    15·2 answers
  • Alternative price indexes
    12·1 answer
  • You are a professional financial analyst that is employed to help evaluate possible merger and acquisition candidates. You have
    14·1 answer
  • e. Which of the following statements is true? Deflation means that the price level is falling, whereas with inflation the inflat
    11·2 answers
  • Self esteem is the part of self concept that involves evaluations of ?
    8·1 answer
  • What tool is used to easily clean metal scales, old paints and rust​
    13·1 answer
  • 2. Why might it be a plus for a company to have such a high share price that trading in its stock is discouraged? What drawbacks
    14·1 answer
  • In the opening case of target's erp implementation, what were the bad managerial decisions made that led to a failed outcome?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!