Hi!
SI units are physical measurements which will be in the form of kilograms, second, kelvin, metres, etc.
Since kilograms measure the weight of an object, it is out. Miles and feet are not SI units, so they are also out. This only leaves one answer left!
Hopefully, this helps! =)
Answer:
90,000 J
Explanation:
Kinetic energy can be found using the following formula.

where <em>m </em>is the mass in kilograms and <em>v</em> is the velocity in m/s.
We know the object has a mass of 50 kilograms. We also know it is a traveling at a rate of 60 m/s. Velocity is the speed of something, so the velocity of the object is 60 m/s.
<em>m</em>=50
<em>v</em>=60
Substitute these values into the formula.

First, evaluate the exponent: 60^2. 60^2 is the same as multiplying 60, 2 times.
60^2=60*60=3,600

Multiply 50 and 3,600

Multiply 1/2 and 3,600, or divide 3,600 by 2.

Add appropriate units. Kinetic energy uses Joules, or J.

The kinetic energy of the object is 90,000 Joules
Answer:
3/7 ω
Explanation:
Initial momentum = final momentum
I(-ω) + (2I)(3ω) + (4I)(-ω/2) = (I + 2I + 4I) ωnet
-Iω + 6Iω - 2Iω = 7I ωnet
3Iω = 7I ωnet
ωnet = 3/7 ω
The final angular velocity will be 3/7 ω counterclockwise.
3. Due to the fact that friction is not converted to kinetic energy nor potential energy. The energy is converted into heat energy which is lost and can’t be put back
Answer:
a)= 98kJ
b)=108kJ
c) = 10kJ
Explanation:
a. The work that is done by gravity on the elevator is:
Work = force * distance
= mass * gravity * distance
= 1000 * 9.81 * 10
= 98,000 J
= 98kJ
b)The net force equation in the cable
T - mg = ma
T = m(g+a)
T = 1000(9.8 + 10)
T = 10800N
The work done by the cable is
W = T × d
= 10800N × 10
= 108000
=108kJ
c) PE at 10m = 1000 * 9.81 * 10 = 98,100 J
Work done by cable = PE +KE
108,100 J = KE + 98,100 J
KE = 10,000 J
= 10kJ
=