Answer:
You would start at 3 on the y-axis and go up 1 and right 3
Step-by-step explanation:
Area= legnth times width
or sometimes
area=legnth times height
area=measure1 times measure 2 on a flat plane
dependson the names
area=27
height=6
area=legnth times height
subsitute
27=legnth times 6
divide both sides by 6
27/6= legnth
simplified to 4 and 3/4
legnth=4 and 3/4 meter
subsitute
Answer:
(a) 74553
(b) 172120
(c) 234802
Step-by-step explanation:
Given
Solving (a): 1998
Year 1998 means that:
So, we have:
--- approximated
Solving (b): 2003
Year 2003 means that:
So, we have:
--- approximated
Solving (c): 2006
Year 2006 means that:
So, we have:
--- approximated
Step-by-step explanation:
ddhdhdhdhdhdddhdshshshhshshhdhhebebeewsheheheh<em>j</em><em>s</em><em>s</em><em>d</em><em>j</em><em>s</em><em>j</em><em>d</em><em>u</em><em>d</em><em><u>s</u></em><em><u>s</u></em><em><u>h</u></em><em><u>s</u></em><em><u>u</u></em><em><u>s</u></em><em><u>j</u></em><em><u>s</u></em><em><u>s</u></em><em><u>o</u></em><em><u>w</u></em><em><u>o</u></em><em><u>s</u></em><em><u>s</u></em><em><u>j</u></em><em><u>j</u></em><em><u>j</u></em><em><u>d</u></em><em><u>d</u></em><em><u>j</u></em><em><u>d</u></em><em><u>j</u></em><em><u>d</u></em><em><u>d</u></em><em><u>j</u></em><em><u>j</u></em><em><u>j</u></em><em><u>s</u></em>
A viable argument showing how it is reflected by the Cost Function for Wichita’s factory is; The cost of production per unit of item produced is 1$ as long as total units produced is less than 2500. If more than 2500 units are produced than the cost per unit actually comes down to 0.8$per unit.
<h3>How to Interpret Cost Functions?</h3>
From the given options, the best statement is;
The plant’s production processes are performed primarily by robots that are able to work longer hours, when needed, at no additional cost.
A cost function is a formula used to predict the cost that will be experienced at a certain activity level. Thus, the cost function for the best option is;
The cost of production per unit of item produced is 1$ as long as total units produced is less than 2500. If more than 2500 units are produced than the cost per unit actually comes down to 0.8$per unit.
The missing options are;
___ The electricity contract with the utility company is structured so that higher daily energy usage is charged at a lower rate.
___ The plant’s production processes are performed primarily by robots that are able to work longer hours, when needed, at no additional cost.
___ Overtime wages were required to produce at levels above 25,000 units.
Read more about Cost Functions at; brainly.com/question/14038368
#SPJ1