1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Katarina [22]
3 years ago
8

A highway contractor owns heavy equipment which is used during the warm weather. During the winter months the equipment is to be

stored. Two options are available for the coming year. One is to store the equipment in an area owned by the company and located on the flood plain of a small stream. If not used, this area can be rented to another company for $10,000 per year. The other option is to rent a protected area for $35,000 per year. If the contractor stores the equipment at its own area and a severe flood occurs the equipment will be destroyed at a loss of $600,000 with probability 0.50 (high damage) and $400,000 with probability 0.50 (low damage). Of course, if there is no flood there is no damage. If the contractor rents a space there is no damage during a flood.
a. What is the probability of the "25-year" flood taking place in any given year?

b. Which alternative should the contractor choose, assuming that the probability of a damaging flood occurring during the winter is 0.02?

c. What is the indifference probability p of a damaging flooding (assume that the probabilities of high or low damage remain the same at 0.50)
Mathematics
1 answer:
Kipish [7]3 years ago
3 0

Answer:

a) 0.04

b) The choice of renting a protected area should be made

c) Indifference probability, P = 0.25

Step-by-step explanation:

a) Probability that the 25-year flood takes place in a given year.

This means that the flood is taking place once in 25 years, and the probability that it takes place in this given year is 1/25 = 0.04

b) The contractor is left with two alternatives, either to stay in protected area or flood plain area.

We will calculate the cost of staying in protected area and the loss incurred if he stays in the flood plain area. The one with the lesser value will be the more preferred decision.

Probability of a damaging flood, pr (flood) = 0.02

Probability of high damage if he chooses the flood plain = 0.5

Pr(high damage) = 0.02 * 0.5 = 0.01

Probability of low damage if he chooses the flood plain = 0.5

Pr(low damage) = 0.02 * 0.5 = 0.01

Loss(low damage) = $400,000

Loss(High damage) = %600,000

Average loss = [Pr(low damage)*Loss(low damage)] + [Pr(high damage) *Loss(High damage) ]

Average loss = (400000*0.01) + (600000*0.1)

Average loss = 4000 + 6000

Average loss = $10,000

Winter lasts for three months, i.e number of months = 3

Therefore the costs of renting the areas should be charged per month

Cost of renting flood plain = $10000 per year = 10000/12 = $833.22/month

Cost of renting protected area  = $35000 per month = 35000/12 = $2916.67/month

The protected area is not used

Cost of rent  for 1 month = $2916.67 - $833.22

Cost of rent for 1 month = $2083.45

Cost of renting protected area in 3 months = 3 * 2083.45 = $6250.34

Since the cost of renting protected area is less than the loss incurred in flood plain area, the contractor should rent a protected area

c)The principle of indifference states that in the absence of any relevant evidence, agents should distribute their credence equally among all the possible outcomes under consideration.

The probability of high or low damage = 0.50

Since there are just two options, and indifference does not assign probabilities based on prior information

Probability(flood) = 0.5

Probability that a flood with high damage will occur = Probability (flood) * Pr(high damage) = 0.5 * 0.5 = 0.25

Probability that a flood with low damage will occur = Probability (flood) * Pr(low damage) = 0.5 * 0.5 = 0.25

You might be interested in
Sammy can run 3 1/2 feet in 2 seconds what is his unit rate ( feet per second)
zlopas [31]
1.75ft/second. 3.5/2 simplifies to 1.75/1.
7 0
4 years ago
Read 2 more answers
What are the missing values in the following geometric sequence?
dezoksy [38]

Answer: 9;0;-3

Step-by-step explanation:

3 0
3 years ago
Julissa's dance class ended at 6:15 pm. It lasted 1 hour and 25 minutes.<br> What time did it start?
Vlad1618 [11]

Answer:

4:50

Step-by-step explanation:

3 0
3 years ago
I neeeeeeeeeddddd helpppppppp
aksik [14]

5/8 paper chains used more than 2 containers but less than 2 3/4 containers of glitter.

7 0
3 years ago
Please please help me, I don’t understand at all, I will truly appreciate it! Thank you
guapka [62]
The answer is A.

y = x^2 + 2 simply means that y is whatever x is to the second power, plus 2. so, -2^2 = 4. 4 + 2 = 6.

you can work this through the other options but A is the answer.
6 0
3 years ago
Other questions:
  • He normal pulse rate of a 13-year-old is between 70 and 100 beats per minute. As part of a health program, the medical staff at
    5·2 answers
  • A small company’s net income for the first six months of the year was $76,500 and for the last six months it was $100,000. What
    10·1 answer
  • Multiply (x - 5)(3x + 6) Express the answer in standard form
    6·1 answer
  • Andrea ran 4 3/8 miles on
    7·1 answer
  • Please Help!!!!! 30 Points!!!!
    10·2 answers
  • What are rational numbers. PLS HELP ASAP.
    10·2 answers
  • De que numero 92 es el 15% mas?
    9·1 answer
  • Find the measure of the missing angle.
    15·2 answers
  • A train is traveling at 60 mph. If the rate of speed increases 4 mph each hour,
    13·1 answer
  • 2 Are 3(x – 4) – 2(2.5x - 1) and -2(x + 5) equivalent expressions?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!