1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AysviL [449]
3 years ago
11

Ty had 50 tickets for games at a carnival.He used 1/5 of the tickets to play the ball-toss game.He then used 1/2 of the remainin

g tickets to play the video games.How many tickets did Ty have after playing these games?Show your work.

Mathematics
2 answers:
gizmo_the_mogwai [7]3 years ago
6 0
50 divided by 5 is 10 so 1/5 is equal to 10. 50-10=40, 40/2=20, 40-20=20 so 20 is the final answer
NNADVOKAT [17]3 years ago
6 0
The answer is 5 tickets left, review the image I've created to see how i got my answer.

You might be interested in
Please help! To solve the equation 1.75n = 7 for n, what operation must be applied to both sides in order to isolate the variabl
Kazeer [188]

Answer:

C

Step-by-step explanation:

1.75n = 7 ( to isolate n divide both sides by 1.75 )

n = \frac{7}{1.75} = 4

6 0
2 years ago
Read 2 more answers
As a result of a cyclone, the price of bananas rose 85% to $9.99 per kg. How much did bananas cost before the cyclone?
Karo-lina-s [1.5K]
The original price was $8.49 :)
7 0
4 years ago
Currently, in Littlefield, jobs arrive at 12 per day and you have (just) enough capacity at each station (i.e., the departure ra
OlgaM077 [116]

Answer:

The WIP limit is 0.50 days.

Step-by-step explanation:

The Computation of WIP limits:

to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:

Value Added Time = 12 days (arriving time)

Non-Value-Added Time = 12 days (departure time)

Efficiency = Value Added / (Value Added + Non-Value Added)

                = 12 / (12+12)

                = 12 / 24

               = 0.50 or 50%

the most obligatory throughput time will be 0.25 days to realize the profits

WIP limit = Throughput time / Efficiency  

               = 0.25 / 50%

               = 0.50 days.

The WIP limit is 0.50 days.

6 0
3 years ago
Alison wants to find the total cost of buying 4 adult admission tickets to an amusement park.identify the input and output
Keith_Richards [23]

If you are talking about a graph:

The input would be the number of adult tickets.

The output would be the amount of money.

If you talking about it normally:

The input would be the amount of money.

The output would be the number of adult tickets.

8 0
4 years ago
Please Help!
MAVERICK [17]
For a translation of 4 units right, the graph will become -3(x-4). the 4 is negative to indicate that the translation is right.
For a vertical stretch of 4, the graph will become 4x-3(x-4)=-12(x-4). 

With this information, g(x)=-12(x-4)
5 0
3 years ago
Other questions:
  • Help me this need to be right
    12·1 answer
  • Which expressions are equivalent to 2(4f + 2g) ?
    7·1 answer
  • Please answer! I need help
    6·1 answer
  • What is X+y(2x-3)=18
    6·1 answer
  • Answer this question
    5·1 answer
  • a. Plot the data for the functions f(x) and g(x) on a grid and connect the points. x -2 -1 0 1 2 f(x) 1/9 1/3 1 3 9 x -2 -1 0 1
    10·1 answer
  • Im am not sure how to do this but I wanna say it’s C
    13·1 answer
  • 3 in.<br> Find the radius and diameter of the circle.<br> Radius =<br> Diameter =
    5·1 answer
  • The sum of two numbers is 24.The difference of their square is 144.what are the two numbers?​
    9·1 answer
  • When solving an inequality, if you the coefficient is negative, as in -3x &gt; 9, the inequality symbol will be reversed.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!