Answer: the due date would be 92 weeks
Step-by-step explanation:
Since the time required to complete a project is normally distributed, we would apply the formula for normal distribution which is expressed as
z = (x - µ)/σ
Where
x = number of weeks.
µ = mean
σ = standard deviation
From the information given,
µ = 80 weeks
σ = 10 weeks
If a construction company bidding on this contract wishes to be 90 percent sure of finishing by the due date, the z score corresponding to 90%(90/100 = 0.9) is 1.29
Therefore,
1.29 = (x - 80)/10
x - 80 = 1.2 × 10
x - 80 = 12
x = 80 + 12 = 92
Answer: The correct option is D.
Explanation:
From the graph we noticed that the x intercept of the line is (2,0) and the y-intercept is (0,2).
If the line passing through two points then the equation of line is,

Since the ien passing through (2,0) and (0,2).



This equation is represented by option D, therefore the option D is correct.
Answer:
1. Segment MN is congruent to segment OP (Given)
2. Angle MNP is congruent to angle OPN (Given)
3. Segment NP is congruent to segment NP (Reflexive prop.)
4. Triangle MPN is congruent to triangle ONP (SAS)
5. Segment MP is congruent to segment NO (CPCTC)
Hope this helps! :)
Answer:
P(F/E) = 0.5
Step-by-step explanation:
We have the following information:
P(E∩F)=0.1
P(E)=0.2
Additionally, the probability P(A/B) of event A given Event B is calculated as:
P(A/B) = P(A∩B)/P(B)
Now, we want the probability P(F/E), so it is calculated as:
P(F/E) = P(E∩F)/P(E)
Finally, replacing the values we get:
P(F/E) = 0.1 / 0.2
P(F/E) = 0.5
Answer:
126
Step-by-step explanation:
7*6=42
7*12=84
42+84=126
hope this helps