Answer:
water contracts as it freezes at 0°C
Answer:
Work done, W = 24.9001 J
Explanation:
Given that,
Force, F = (2xî + 4yĵ) Where x and y are in meters
This force acts on an object as the object moves in the x-direction from the origin to x = 4.99 m.
We need to find the work done by the force on the object. It is given by :
So, the work done is 24.9001 J.
A diagram showing the forces acting on the object. The object is represented by a dot with forces are drawn as arrows pointing away from the dot. Sometimes called force diagrams.
Answer:
The formula for calculating Density is:
= Mass / Volume
From this formula, we can say that the relationship between Mass and Density is a direct one. In other words, if mass is increasing - all else being equal - then density will increase as well.
If mass however was decreasing, density would have to decrease as well.
For example, assume 3 bricks have masses of 5kg, 10kg and 15kg. Also assume that the bricks all have the same volume of 5 m³.
Density of 5kg brick = 5 / 5 = 1 kg/m³
Density of 10kg brick = 10 / 5 = 2kg / m³
Density of 15kg brick = 15 / 5 = 3 kg /m³
<em>Notice how density increases as mass increases and decreases when mass decreases. </em>