1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Mariulka [41]
4 years ago
10

Suppose that Motorola uses the normal distribution to determine the probability of defects and the number of defects in a partic

ular production process. Assume that the production process manufactures items with a mean weight of 10 ounces. Calculate the probability of a defect and the suspected number of defects for a 1,000-unit production run in the following situations.
(a) The process standard deviation is 0.15, and the process control is set at plus or minus one standard deviation. Units with weights less than 9.85 or greater than 10.15 ounces will be classified as defects. If required, round your answer to four decimal places.
(b) Through process design improvements, the process standard deviation can be reduced to 0.05. Assume that the process control remains the same, with weights less than 9.85 or greater than 10.15 ounces being classified as defects. If required, round your answer to four decimal places.
(c) What is the advantage of reducing process variation, thereby causing process control limits to be at a greater number of standard deviations from the mean?
Mathematics
1 answer:
Mekhanik [1.2K]4 years ago
7 0

Answer:

\mathbf{P(X < 9.85 \ or \ X> 10.15) \approx 0.3171}     to four decimal places.

\mathbf{P(X < 9.85 \ or \ X> 10.15) =0.0027}  to four decimal places.

Step-by-step explanation:

a)

Assuming X to be the random variable which replace the amount of defectives and follows standard normal distribution whose mean  (μ) is 10 ounces and standard deviation (σ) is 0.15

The values of the random variable differ from mean  by ±  1 \such that the values are either greater than (10+ 0.15) or less than  (10-0.15)

= 10.15 or  9.85.

The  probability that the amount of defectives which are either greater than 10.15 or less than 9.85 can be calculated as follows:

P(X < 9.85 \ or \ X> 10.15) = 1-P ( \dfrac{9.85-10}{0.15}< \dfrac{X-10}{0.15}< \dfrac{10.15-10}{0.15})

P(X < 9.85 \ or \ X> 10.15) = 1- \phi (1) - \phi (-1)

Using the Excel Formula ( = NORMDIST (1) ) to calculate for the value of z =1 and -1 ;we have: 0.841345 and 0.158655 respectively

P(X < 9.85 \ or \ X> 10.15) = 1- (0.841345-0.158655)

P(X < 9.85 \ or \ X> 10.15) =0.31731

\mathbf{P(X < 9.85 \ or \ X> 10.15) \approx 0.3171}     to four decimal places.

b) Through process design improvements, the process standard deviation can be reduced to 0.05.

The  probability that the amount of defectives which are either greater than 10.15 or less than 9.85 can be calculated as follows:

P(X < 9.85 \ or \ X> 10.15) = 1-P ( \dfrac{9.85-10}{0.05}< \dfrac{X-10}{0.05}< \dfrac{10.15-10}{0.05})

P(X < 9.85 \ or \ X> 10.15) = 1- \phi (3) - \phi (-3)

Using the Excel Formula ( = NORMDIST (3) ) to calculate for the value of z =3 and -3 ;we have: 0.99865 and 0.00135 respectively

P(X < 9.85 \ or \ X> 10.15) = 1- (0.99865-0.00135)

\mathbf{P(X < 9.85 \ or \ X> 10.15) =0.0027}  to four decimal places.

(c)  What is the advantage of reducing process variation, thereby causing process control limits to be at a greater number of standard deviations from the mean?

The main advantage of reducing the process variation is that the chance of getting the defecting item will be reduced as we can see from the reduction which takes place from a to b from above.

You might be interested in
According to the graph what is the value of the constant in the equation below ​
Alex
It would be B (2.5)

Explanation: The Y values go up by 2.5 for each graph point higher than the one before.
8 0
3 years ago
Suppose the area of a square 16 yards. Find the perimeter of the square.
kati45 [8]
You take the area and find the square root
                       V                              V
                      16                              √
so you would be looking for √16 which equals 4

then you would add 4 by the length of the other 4 side to find the perimeter, which is ironically 16
7 0
4 years ago
What is the measure of ∠F?<br> What is the measure of ∠R?<br> What is the measure of ∠C?
DanielleElmas [232]
C= 43
I'm not sure what the measure of R is, but I think the measure of F is 55°. I'm not 100% sure, which I feel terrible about, but I am positive that C= 43
:)
7 0
3 years ago
Read 2 more answers
What is the measure of LXZW?<br> 850<br> 150°<br> Y<br> 65°<br> 95<br> Z<br> 215°<br> W<br> 30°
Semenov [28]

Answer:

so the answer is 95°

Step-by-step explanation:

The two angles on a line add up to 180° or are supplementary, so we can find the inside angle x by doing 180-150=30°. Now that we know inside x is 30, if we add 30+65, we get 95, and 180-95=85°. Then to find angle xzw, just do 180-85 to get 95°.

3 0
3 years ago
(9x + 7)(4x + 1)(3x + 4) = 0<br> 1 root<br> 3 roots<br> 4 roots<br> 9 roots
Andrews [41]

Answer:

3 roots

Step-by-step explanation:

x=-7/9, - 1/4 and - 4/3

6 0
3 years ago
Other questions:
  • C−12&gt;−4 ...................................
    15·2 answers
  • What is the next number in the pattern?
    6·2 answers
  • What multiples to -35 but adds to 8
    7·1 answer
  • A computer store bought a program at a cost of ​$10 and sold it at a selling price of ​$12. Find the percent markup.
    6·1 answer
  • A dvd has a diameter of 15 milimeters. Which equation can help you determine the circumference
    5·1 answer
  • Is 12/30 and 18/45 proportional, or not proportional?
    11·2 answers
  • Colby graphed a scatter plot of student exam scores (y) and the number of hours each student had slept the night before the exam
    9·2 answers
  • Please i will give brainlist
    7·1 answer
  • √b-6 plz answer my question because i need help
    8·1 answer
  • Can smb answer this please ion get it
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!