Answer:
Qualitative data
Step-by-step explanation:
Qualitative methods like an interviews and observations that are considered valuable as of their detail, descriptiveness, and uniqueness.
In this given situation, it is already known that the specific painter who outperforms in the factory.
And my motive is to gain an understanding with respect to the performing as a best painter for an automative industry so the same information would be observed and interviewed him
Answer:

Therefore, option C is correct.
Step-by-step explanation:
We have been given the equation:

We will take LCM 4 on right hand side of the above equation:

Now, we will multiply the 4 in denominator on right hand side to the y in left hand side pof the equation we get:

After rearranging the terms we get:

Therefore, option C is correct.
Solving for x would give me 14 and negative 10 which would lead to the problem looking like so 14(-10-4)=140
Answer: Time taken by Ximena to paint the fence alone = 24 hours
Time taken by Candice to paint the fence alone = 12 hours
Step-by-step explanation:
Let x= Time taken by Ximena to paint the fence alone .
Time taken by Candice to paint the fence alone = x-12
As per given , we have

if x= 4
Time taken by Ximena = 4 hours
Time taken by Candice = 4-12 hours =-8 hours which is not possible. (time cannot be negative)
Therefore, x= 24
Such that
Time taken by Ximena to paint the fence alone = 24 hours
Time taken by Candice to paint the fence alone = 24-12=12 hours
Answer:
324
Step-by-step explanation: