Nonamiya [84]
3 years ago
8

A(n) ________ is a specific type of computer program that manages all programs on a computer.

Computers and Technology
1 answer:
Oksi-84 [34.3K]3 years ago
4 0
A kernel manages the whole computer including hardware. In Unix, all processes are launched from systemd/launchd.
You might be interested in
"what is the problem with using challenge handshake authentication protocol (chap) as an authentication protocol?"
Alexxandr [17]

Its use of the message digest 5 (MD5) hash algorithm for security.

CHAP uses a combination of MD5 hashing and a challenge-response mechanism, and authenticates without sending passwords as plaintext over the network. The security of the MD5 hash function is severely compromised.

5 0
3 years ago
West Point Bridge Designer | Does anyone know a way to make this bridge cost less?
e-lub [12.9K]
Make the zig zag part more spaced out
4 0
3 years ago
thick is incorrect does anybody know the correct answer? please don’t send any files i can’t open them
77julia77 [94]

Answer:

i think its new

Explanation:

if this is incorrect i apologize

7 0
3 years ago
The best how can i get. Ethiopian bank enterance examination for natural science grade 12?
zubka84 [21]

do your own work ************************************************************************************************************************************************************

5 0
3 years ago
Which of the following is the estimate of the minimum amount of time it would take to perform a task? (Points : 2) Minimal durat
kondor19780726 [428]

Answer:

Optimistic duration

Explanation:

The following three concepts are Project management concepts:

Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.

Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc

Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.

Which of the following is the estimate of the minimum amount of time it would take to perform a task?

The answer is Optimistic duration

7 0
3 years ago
Other questions:
  • How do social media sites illustrate kindness?
    15·1 answer
  • ABC software company is to develop software for effective counseling for allotment of engineering seats for students with high s
    13·1 answer
  • Instagram
    9·1 answer
  • Name the contributions of Steve Jobs and Bill Gates, with respect to technology.
    5·1 answer
  • Which item is most important for a successful website design?
    6·2 answers
  • - Consider the relation R = {A, B, C, D, E, F, G, H, I, J} and the set of functional dependencies F = { {B, C} -> {D}, {B} -&
    14·1 answer
  • A barcode is a Select one: a. coded instruction needed to control computer hardware. b. confidential computer code required by H
    7·1 answer
  • What type of attacks take advantage of vulnerabilities in poorly coded web application software to introduce malicious program c
    9·1 answer
  • With _________, users will receive recommendations for items liked by similar users.
    9·1 answer
  • Which of the following is not a method for opening Word software?
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!