The amount of work done by Kalon in an hour is equal to 1/4. This is based on his time to finish the job. Letting x be the number of hours Marna can finish the job alone will let her finish 1/x of the job in an hour. If their rates are added together and multiplied by the number of hours they worked together, the product should be one whole job.
(1/4 + 1/x)(1 5/7) = 1
The value of x is 3. Therefore, it will take 3 hours for Marna to clean the chimney alone.
Answer:
i think its -1
Step-by-step explanation:
sorry if im wrong
Answer
3 x 80=240
240 / 4=$60 effective unit rate for each tire.
Step-by-step explanation:
mark me as brainliest!
Answer:
The answer is 80. If you multiply 40 x 3 it is 120 and 40 x 2 is 80 so 2/3 of 120 is 80 NOT 40
15. s = 10 because in a 45-45-90 degree triangle the longer and shorter leg have the same distance, r = 10√2 because the hypotenuse in a 45-45-90 degree triangle is √2 times the same variable as the longer and shorter leg
16. n °= 30° because it is a 30-60-90 triangle I knew that it was 30 degrees, 2n° = 60° because variable n equals 30 degrees and two times 30 equals 60, q = 15√3 I followed the formula of a 30-60-90 degree triangle that states the longer leg is equal to √3 times the shorter leg, p = 15 I got this answer because the hypotenuse (which is 30) is two times the shorter leg so all I had to do was divide by two to get 15 (the shorter leg)
17. Couldn't see got cut off.
18. c = 12 I saw that the square was made up of 4 congruent triangles and I noticed that one triangle had its hypotenuse given. I noticed that this triangle was a 30-60-90 degree triangle so I took 24 (the hypotenuse) and divided it by two to get 12 because the hypotenuse is two times the shorter leg. Next I looked at where variable c was and since all the triangles are congruent I saw that It was the shorter leg and I took the 12 that I found in the former triangle to get the answer c = 12.<span>
*I also suggest you look up on google "special right triangle formulas"</span>