Train A: Speed of 60 mph. (1 mile per minute)
Train B: Speed of 90 mph. (1.5 miles per minute)
after 2 hours: (2:00)
Train A has gone 120 miles. (half-way mark)
Train B has gone 0 miles.
Hour 2:48: (2:48)
Train A has gone 168 miles.
Train B has gone 72 miles.
72 ----><---------------168
At 2:48 P.M the two will meet. 72+168=240
I hope this helps! :)
X + y = 40.....multiply by -4
4x + 6y = 180
-------------------
-4x - 4y = -160 (result of multiplying by -4)
4x + 6y = 180
------------------add
2y = 20
y = 20/2
y = 10 <===
x = 30
Step 4 is wrong. the answer is 1/8, she changed sign on 2^(-3) to 2^(3) without moving it to numerator
Answer:
Slope of the line = 2
Step-by-step explanation:
Slope of a line through two points lying on the line and is given by,
Slope =
From the figure attached,
Given line is passing through two points (0, 1) and (1, 3).
Therefore, slope of the line will be,
Slope =
= 2