Answer:
40 (without the percent sign because the question doesn’t want you to put it)
Step-by-step explanation:
This is a very reasonable diagram because the 216˚ plus the 144˚ equal 360˚, which is sensible because a circle is 360˚ (degrees). So, you can just do 144 divided by 360 to find the percent of the circle, which equals 0.4, and 0.4 as a percent is 40%. But the question doen’t want to you to put the percent sign. So the answer is just 40.
Answer:
- 18 Type A bags
- 24 Type B bags
Step-by-step explanation:
The graph shows the constraints and the boundaries of the feasible region. The maximum profit will be had with the manufacture of 18 Type A bags and 24 Type B bags.
__
The inequality describing the constraint on cutter hours is ...
2a +3b ≤ 108
The inequality describing the constraint on finisher hours is ...
3a +1b ≤ 78
The boundary lines of the solution regions of these inequalities intersect at ...
(a, b) = (18, 24)
The profit function is such that it doesn't pay to make all of one type or the other bags. The most profit is had for the mix ...
18 Type A bags; 24 Type B bags.
On the graph, the line representing the profit function will be as far as possible from the origin at the point of maximum profit.
Answer:
<h2>f(5) = 17</h2>
Step-by-step explanation:
f(x)=3x+2
To find f (5) replace every x in f(x) by 5
That's
f(5) = 3(5) + 2
= 15 + 2
<h3>= 17</h3>
Hope this helps you
Answer: draw a dot at -7 on the x-axis and a dot at positive 7 on the y-axis. then draw your line through the dots and across the graph using a ruler or just try drawing a straight line.
Step-by-step explanation:
3/4 × 3/3 = 9/12
3/4 × 2/2 = 6/8