1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
son4ous [18]
3 years ago
12

A.It will stay the same

Mathematics
1 answer:
DanielleElmas [232]3 years ago
4 0

Answer:

B

Step-by-step explanation:

Let's arrange the data set in increasing order.

We have 19, 27, 27, 33, 45, 53. The median is (27 + 33) / 2 = 30.

The new set is 19, 27, 27, 33, 45, 53, 90. The new median is 33.

Since 33 - 30 = 3 the answer is B.

You might be interested in
Simplify. Assume that no denominator is equal to zero. (show work) <br> help please!!!!!
MrRa [10]

n^8

basically it's like this n^12/n^4 = n^(12-4) = n^8

5 0
2 years ago
Find the slope of the line and tell what the slope represents
Ainat [17]

Answer:

slope is 2

it represents the difference between the 2 points

8 0
3 years ago
Chad is planting a plant that is 4 inches tall. He wants the hole he is digging to be as deep as the plant is tall. What integer
Arturiano [62]

Answer:

-4 in

Step-by-step explanation:

4 inches underground, assuming that ground level is 0, is negative four inches.

4 0
2 years ago
Please write out the problem on paper
skad [1K]
Your answer will be n5
7 0
2 years ago
cehgg A costing system that first assigns costs to activities and then to products is a.job-order costing. b.activity-based cost
Ronch [10]

Answer:b.activity-based costing.

Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.

THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.

8 0
3 years ago
Other questions:
  • Is 0.07 less than 0.06
    11·1 answer
  • John is putting money into his saving account. He starts with $350 in the savings account, and each week he adds 60$
    10·1 answer
  • at a local pizza parlor, the large pies have a diameter of 16 inches. each large pie can be cut into either 8 slices or 12 slice
    13·1 answer
  • Form 914 M.
    13·1 answer
  • PLZZZ HELP ME!!! AND QUICK!!!
    10·2 answers
  • HELP I'm stupid and idk what the answer is!
    8·2 answers
  • Yalll ya gurl is struggling I need help SOS
    8·1 answer
  • The first three terms of a geometric sequence are as follows.
    8·1 answer
  • To build a deck, Roberto needs to buy 180 screws (s), 9 posts (p), and 36 pieces of 1" by 6" lumber (l). He already had the rest
    8·1 answer
  • If x = 3 and y = 6, evaluate the following expression:<br> 100 – 3(3y - 4x)
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!