Answer:
On the average, estimates will be either be 0.2 meters too short or too long.
Step-by-step explanation:
Standard deviation is normally used to show how the actual value of a variable in a given sample deviates from the mean or average value of the sample. The deviation could be slightly more or less than the average value by the value of the standard deviation. Therefore, in this question, the standard deviation shows that the estimates could be 0.2 m short or more than the mean.
We want to compare averages. From the histogram we have we don't know the exact mean, but if we just assume the average in each bin is the midpoint of the bin we can make an estimate.
Supplier A has
mean = ( 22(64) + 27(66) + 26(68) + 15(70) + 10(72) )/(22+27+26+15+10)
mean = 6728/100 = 67.28 grams
Supplier B has mean 66.5
Answer: Choose Supplier A
(work shown above)
Probability that the questions are answered corectly1/4 = 0.25
probability that they are answered wrong 3/4 = 0.75
probability that 4 out of 7 are corect 7C4(0.25)4(0.75)3 which equals 0.0577
Answer: if i knew i would help sry.
Step-by-step explanation:
I think it’s one half 1/2