One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42
Answer:
No
Step-by-step explanation:
When you divide by 0, you will get an undefined error. When you try to graph a divide by 0, you will get asymptotes.
Hello,
(5x-2)+(2x+6)=67
==>7x+4=67
==>7x=67-4
==>7x=63
==>x=63/7
==>x=9
|AB|=5x-2=5*9-2=45-2=43 (miles)
With questions like this (to see if theyre parallel), all you have to do is see if lines have a congruent slope. if yes (ex: 2 and 2), then they are parallel. if the slopes are opposites (ex: 4 and -1/4), then they are perpendicular. If they have no such relation (ex: -3 and 1/7), then they are neither.
with this problem, find the slope by separating the same variable in each equations, like this:
2x + 7y = 6
-2x -2x
7y = -2x + 6
(the second equation is already separated) so now we have
7y = -2x + 6 and 7y = 2x + 6
since -2 does NOT equal 2, these two graphs/lines are NOT parallel.
Hope this helped!
4a-2=a+4
+2 to both sides
4a=a+6
-a from both sides
3a=6