100101 is 37 in decimal form
Answer:
t = [0:0.01:4];
x = 5*t - 10;
y = 25442 - 120*t + 144;
d = x.^2 + y.^2;
min = 1e+14;
for k = 1:length(t)
if d(k) < min
min = da(k);
tmin = t(k);
end
end
disp('The minimum distance is: ')
disp(sqrt(min))
disp('and it occurs at t = ')
disp(tmin)Output:
>> withLoop
The minimum distance is:
2.5106e+04
and it occurs at t =
4
Explanation:
Answer:
A.
Explanation:
A well designed high-volume system will minimize work-in-process (WIP) inventory and reduce lead time for the product.
Work in process (WIP) are partially finished products. WIP inventory could be minimized by designing a suitable high-volume system.
Lead time or throughput time is the time taken for a product to be manufactured or processed. A well designed high-volume system would reduce throughput time.
Answer:
A
Explanation:
The information was written recently or has been updated recently.
Answer:
push, pop, top, clear
Explanation:
push: add a new value
pop: remove and return top value
top: return top value without removing
clear: remove all values